ROLL OFF TRUCK
FORMAL HAZARD ASSESSMENT:
1013-FHA-TK.ROLLOFF
1013-FHA-TK.ROLLOFF
SAFE WORK PROCEDURE:
1013-SWP-TK.ROLLOFF
1013-SWP-TK.ROLLOFF
HAZARDS
- Driving Hazards
- Heat / cold
- Electricity
- Cuts / laceration
- Pinch / Crush
- Chemical
- Skid/Bin
- Equipment Failure
EMERGENCY RESPONSE PLAN
Follow Country Pump Outs ERP Procedure
Follow Country Pump Outs ERP Procedure
PPE REQUIRED
PRE-START CHECKS
- Wear appropriate personal protective equipment (PPE) as listed above
- Ensure all personnel are trained and competent to perform the task at hand
- Ensure personnel are fit for duty
- Ensure truck is clean and fully stocked with tools and supplies.
- Conduct a trip inspection according to the NSC Standard 13 Pt. 2 Schedule 1 (See 1001-SWP-T.INSP)
COLD WEATHER PRE-START CHECKS (less than °0)
- Start truck and allows all systems to warm up.
- Depress clutch
- Put truck in gear
- Activate PTO switch
- Put truck in neutral
- Release clutch
- Once PTO is up to temperature, depress clutch
- Turn PTO switch off
SAFE WORK PROCEDURE
- Start the engine and allow all systems to warm up.
- Do a walk around of the truck to ensure there are no leaks, everything is in good visual condition, and you are clear of anything that would interfere with the operation of your unit such as a tree branches, overhead powerlines or overhead doors.
- Always drive to road conditions and follow all traffic laws.
- Always use a spotter when required to back up.
- When arriving at the job site, position the truck appropriately and set any required safety signals or barriers.
- Do not enter customer buildings with truck.
- Do not back up to air exchangers or intakes
- Perform tasks as dispatched.
POST OPERATION PROCEDURE
- Perform a visual inspection of truck and job site for any damage or signs of wear, reporting any issues to the appropriate personnel.
- Properly clean and stow tools and any other equipment used.
- Document the completed job, including unit numbers
- Record any issues if necessary
- If there are damages to the rentals, fill out the proper documentation
- Select the documents time in Samsara
- Create new document
- Select “Equipment Damage Report”
- Complete a final walk around before leaving site.
END OF DAY PROCEDURE
- Fill trucks fuel tank
- Ensure truck is clean, free of garbage and fully stocked with tools and supplies.
- Conduct a trip inspection according to the NSC Std 13 Pt. 2 Schedule 1 (See 1001-SWP-T.INSP)
- Idle truck down
- Shut truck off
- Turn off night switch (if equipped)
- Complete all required paperwork from the day, close out driver log.
- Return keys to key box
- Plug block heater in