portable toilet safe work procedures
SAFE WORK PROCEDURE:
1017-SWP-PTOILET
1017-SWP-PTOILET
HAZARDS
- Heat / cold
- Cuts / laceration
- Pinch / Crush
- High Pressure
- Biological Waste
EMERGENCY RESPONSE PLAN
Follow Country Pump Outs ERP Procedure
Follow Country Pump Outs ERP Procedure
PPE REQUIRED
PRE-START CHECKS
- Wear appropriate personal protective equipment (PPE) as listed above
- Ensure all personnel are trained and competent to perform the task at hand
- Ensure personnel are fit for duty
SAFE WORK PROCEDURE - LOAD & UNLOAD FROM TRUCK, DECK, TRAILER, GROUND
- Always use a spotter when required to back up.
- Park in position not to damage ground or property
- Park close to portable toilet
- Shuffle toilet into position (approximately 2-4 feet from deck or trailer)
- Tilt portable toilet back
- Bear-Hug portable toilet
- Lift (with your legs) up while stepping forward to place portable toilet
- Secure portable toilet
- Always use a spotter when required to back up.
- Park in position not to damage ground or property
- Park close to portable toilet
- Bear-Hug portable toilet
- Lift (with your legs) up while stepping back
- Place portable toilet down
- Shuffle into position
- Secure portable toilet if required